Abstract: This form calculates the rough financial cost and savings in time and money from a telemetry investment. It does not include all variables and certain figures are based of loose averages (2007). It does not calculate savings in the cost of labout on the assumption that spare labour will be used and paid for elsewhere. The cost per waterpoint can be considerably higher or lower depending on the technology used and the ease of installation.